Abstract

An approach to determining the reliability of a hybrid multiterminal HVDC sub-transmission system is presented. The performance analysis of a multiterminal HVDC subtransmission system is divided into three main segments: the rectifiers, the inverters and the underground cable system. The reliability models associated with the three segments are developed and a reliability evaluation procedure is presented. Two sets of indices, namely the basic load point indices and the system performance indices, are calculated to measure the reliability of a system. The proposed technique is applied to a hypothetical multiterminal HVDC subtransmission scheme and the results are presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.