Abstract

Concrete work in the winter and related organizational and technological decisions affect the efficiency of the construction project, both at the stage of technological design and at the stage of work. This work shows a review of research on organizational and technological solutions that affect the quality of monolithic structures in the construction of residential multistory buildings in the winter. We justified the choice of potential as the most optimal tool that will solve the problems posed in the study. We have identified the main regression coefficients for calculating the second-order regression equation. We performed data processing of production and technological modules and their correlation relationships identified in previous studies. The core matrix of the orthogonal central compositional plan is calculated. Variance of reproducibility has been determined. We have obtained the regression coefficients in this paper. We carried out the significance of these coefficients using the standard error. Further directions for the development of research into the potential of organizational and technological solutions for the production of concrete work in the winter were identified in this article. They were determined by determining the adequacy of this model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.