Abstract
The cryogenic system of the LHC will be upgraded by 2025 to comply with a considerable increase of beam induced heat loads deriving from higher beam currents and peak luminosity levels from the High Luminosity LHC. The current baseline foresees a modified sectorisation scheme with three additional cryogenic plants dedicated to cool the insertions at LHC’s points 1, 4 and 5, reducing the refrigeration duty of the existent adjacent plants. This paper assesses the refrigeration duty of the eight existing plants considering the modified sectorisation and increased heat load deposition. The accelerator loads and distribution losses are quantified for each plant and compared to the existing refrigeration capacity. The heat load values were obtained from the extrapolation of previous LHC assessments as well as from new calculations. Specifically for the LHC point 4 cryogenic equipment, based on updated refrigeration requirements, the upgrade of an existing plant is proposed as an alternative to the baseline scenario.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.