Abstract

Based on the review and reflection of typical cases, this paper analyzes the poor information transmission in the event of accident. Besides, it puts forward the effective measures to solve the bottleneck of information interaction between the current construction management unit and the construction project department, combining the actual situation of the power grid information.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.