Abstract

The Phasor Measurement Unit (PMU) is a modern metering device installed to monitor and control the power system network. However, the number of PMUs and their placements ought to be optimized to satisfy the techno-economic demand. In this paper, the PMU placement problem has been expressed as a multi-objective problem. Modified whale optimization algorithm (MWOA) is proposed to solve Optimal Placement of PMUs (OPP) problem formulation aiming at minimizing the required number of PMU installation subjected to complete network observability and maximizing the reliability for better operation of power systems. Here, the simultaneous optimization of the two conflicting objectives is performed using a fuzzy-based modified whale optimization algorithm (FMWOA). Besides, single objective optimization problems with and without considering the zero-injection bus constraint and multi-objective optimization problem with zero injection bus constraint have been investigated. The proposed method is validated on small and larger test systems, namely IEEE 14, 30, 57, 118 bus systems, and the polish 2383-bus system. Also, the proposed algorithm results are compared with those of previously published for better clarity.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.