Abstract

Abstract The purpose of this paper is to integrate a quality control (inspection) procedure into a job shop manufacturing process described by an M/M/1 queue. Given a joint inspection and queueing system, an optimization problem for minimizing inspection and queueing related costs is formulated and resolved.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call