Abstract

Summary Hydraulic fracturing has historically been a prime engineering tool for improving well producing rates, either by circumventing near-well damage or by stimulating well performance. This paper describes a somewhat new fracturing application where increasing rate was not the primary goal. In this case, the goal for fracturing was modification of the flow profile to allow a more uniform vertical production profile and thereby maximize sand-free rates over the perforated section of the reservoir. In best cases for such applications, this technique allows perforating of "weak" rock to be skipped, reduces risks of sand production, and allows greater wellbore drawdown through perforated intervals in more competent reservoir rock. This allows better long-term productivity and improved recovery and total project economics. In short, it was hoped that propped fractures would improve reservoir management of the Etive/ Rannoch formations in the Gullfaks field.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.