Abstract

The Chinese Fusion Engineering Testing Reactor (CFETR), complementing the ITER facility, is aiming to demonstrate fusion energy production up to 200 MW initially and to eventually reach DEMO relevant power level 1 GW, to manifest a high duty factor of 0.3–0.5, and to pursue tritium self-sufficiency with tritium breeding ratio (TBR) >1. The key challenge to meet the missions of the CFETR is to run the machine in steady state (or long pulse) and high duty factor. By using a multi-dimensional code suite with physics-based models, self-consistent steady-state and hybrid mode scenarios for CFETR have been developed under a high magnetic field up to 6.5 T. The negative-ion neutral beam injection together with high frequency electron cyclotron wave and lower hybrid wave (and/or fast wave) are proposed to be used to drive the current. Subsequently the engineering design of CFETR including the magnet system, vacuum system, tritium breeding blanket, divertor, remote handling and maintenance system will be introduced. Some research and development (R&D) activities are also introduced in this paper.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.