Abstract

In the present project of the Higher Technological Institute of Fresnillo, in the area of ​​mining engineering, a theoretical-practical research project is developed that focuses on the loss of time and processes in long drilling. In operations carried out with this long drilling procedure, production costs increase and profits are reduced. Training programs will provide better dexterity to operators, making their practical tasks easier and safer. This will guarantee growth and profits at a level. personal and business in the mining field, with the reduction of accidents, downtime and bad practices with the correct training of operators.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call