Abstract
In article the problem of independent tram track subgrade and road street design and construction in case of tram tracks integrated with streets pavement and track-road level crossings was concerned. Terminological dissimilarity applied in road and railway branches was pointed out. Types of problems performed on the edge of this branches were defined. Review and analysis of tram track subgrade constructional solutions used in Wrocław during last 25 years were made. Manners of solution defined problems were proposed. In summary importance of analyzed problems were highlighted and the necessity of obligatory rules revision was demonstrated.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.