Abstract

Due to urbanization and population increase, need for metro tunnels, has been considerably increased in urban areas. Estimating the surface settlement caused by tunnel excavation is an important task especially where the tunnels are excavated in urban areas or beneath important structures. Many models have been established for this purpose by extracting the relationship between the settlement and the factors that influence it. In this paper, Random Forest (RF) is introduced and investigated for the prediction of maximum surface settlement caused by EPB shield tunneling. Various factors that affect this settlement, including geometrical, geological and shield operational parameters were considered. The results of RF model has been compared with the available artificial neural network (ANN) model. It is shown that the proposed RF model provides more accurate results than the ANN model proposed in the literature.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.