Abstract

The main goal of this study is to enhance the prediction of ground surface settlements induced by Earth pressure balance (EPB) shield tunneling. In the setting of Changzhou, China, a comprehensive database of long-term ground-displacement findings from Metro Lines No. 1 and No. 2 was analyzed with the goal of assessing the parameters characterizing the settlement, i.e., volume loss, trough width parameter. For the metro lines in the water-rich soft strata of Changzhou, the ground loss Vl is usually in the range of 0.1–0.75%, and the trough width parameter K is usually in the range from 0.3 to 0.7. A superposition analytical method is proposed to estimate the short-term ground settlements induced by shield tunneling, with attention given to ground loss as well as shield working loads. The suggested analytical approach was found to be in good agreement with the field measurements in the case of EPB shield tunneling. This study can provide a reliable assessment of the long-term as well as short-term ground surface settlements for tunnel design.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.