Abstract

Common design and operational issues to evaluate the performance of an ultrafiltration (UF) membrane water treatment plant are highlighted with a case study on an industrial-scale drinking water treatment plant located in Malaysia. This treatment plant has been in operation since February 2013 using dead-end polyethersulfone UF membrane filtration system to produce up to 14 million litres a day of drinking water to a small township. Literature solutions are compared with the practised solutions and elucidated with the case study. Gaps between literature solutions which are mainly based on lab-scale research and industry practices are identified. Reducing this gap will have vast implication to improve the design and operation of industrial-scale UF treatment system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call