Abstract

Post evaluation of power grid investment and construction project is an important part of power grid construction project. The effect of post evaluation will directly affect the quality level of project construction. Therefore, this paper proposes an improved post evaluation system based on rough set and fuzzy multi-level extension. Firstly, the main factors affecting the function effect of power grid construction project are analyzed. Then, the improved fuzzy multi-level extension evaluation model is constructed by combining fuzzy comprehensive evaluation theory with multi-level extension evaluation method. Finally, a 220 kV substation construction project is taken as an example to verify the validity and rationality of the model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.