Abstract
A two-layer planning method for regenerative electric heating considering the heat load during power outage was proposed. Firstly, the model of regenerative electric heating system was established. Then, the heat load model during power outage was established. On this basis, the optimal planning model was proposed, which took the minimum daily operation cost as the objective function. Finally, a typical regenerative electric heating systems was used as a test system to illustrate the effectiveness of the method. The case results showed that the proposed method can effectively satisfy the heat load during power outage.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.