Abstract

In order to reduce the wide body aircraft refueling process time-cost and improve the airport operation efficiency, pressure refueling system design strategy was innovated. The shutoff valves’ operation sequence in refueling process was optimized. The diameter of the orifices on the pressure refueling system fuel line was designed. Pressure refueling performance was simulated and analyzed at different scenarios. The results show that it can improve the pressure refueling system performance at different scenarios by optimizing the pressure refueling process strategy design including optimizing the fuel line orifice design and optimizing the wing tank inner side shut-off valve operation sequence.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.