Abstract

Jl. Xx – Jl. Xx there is one of the point where during the rainy season there is a puddle that cause damage to the road. The purpose of this study is to redesign of drainage system, plan the cost estimate and to make scheduling. The required rainfall data for 2009-2018 are obtained from 3 nearby rain stations, topographic, population data in the sub-district Xx in 2018, and Work Unit Price of Xx Regency in 2018. The redesign use a design discharge with the 5 years cycle time. The methode is used rational method by comparing the discharge plan and discharge on the exsisting channels. The result of the survey of the condition the existing channels contained a lot of garbage, sediment, weed, and some damaged the channels. The rain discharge design with a 5 years cycle time is 95.091 mm/day. The biggest dimensions for the redesign is 1.7 m x 1.7 m, while the smallest is 0.6 m x 0.6 m. Plan supporting buildings such as water tunnels, inlets, step buildings, and infiltration wells, with the total cost of IDR 8,435,671,000, the project can be completed within 95 work days.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call