Abstract

In the implementation method most contractors use conventional formwork which takes longer time. Therefore, it is necessary to use an innovation with semi-conventional system formwork method which is a combination of multiplex and hollow material. The purpose of this study is to analyze the strength of the half-system formwork, its implementation, and the operational costs of the project of 1 to 9 floors with a total area of 5,708.255m2. The data used include shop drawings and work unit prices of Surabaya City 2018. Microsoft Excel 2016 was for the calculations and Microsoft Project 2016 was for the scheduling. The calculations resulted semi-conventional formwork using wood and hollow steel of beam and slab formworks on 161 work days Rp. 2.790.745.668,86.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.