Abstract

Timing closure is crucial to successful very large-scale integration designs. In the physical design stage, designers must iterate their design to develop a layout that can resolve timing violations, which is relatively time consuming. The challenges of pre-routing timing prediction include delay prediction for routed wires and behavior analysis for post-route timing optimization. We present a path-based, pre-routing timing prediction mechanism using a machine-learning methodology and extracted features, which are the essential properties associated with path delay and timing optimization. Experimental results demonstrated that the slack values of the timing paths predicted using the proposed model are much closer to those at the post-route stage reported by an electronic design automation (EDA) tool, with R-square scores ranging from 0.994 to 0.998. Moreover, the proposed model exhibits considerable superiority in predicting the n most-timing-critical paths compared with the EDA tool at the post–clock tree synthesis (CTS) stage. The number of timing-critical paths that were the same as the 100 most-timing-critical paths reported by an EDA tool at the post-route stage is 63 to 86, whereas only 1 to 54 paths are reported at the post-CTS stage.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call