Abstract
Higher cost and stochastic nature of intermittent renewable energy (RE) resources complicate their planning, integration and operation of electric power system. Therefore, it is critical to determine the appropriate sizes of RE sources and associated energy storage for efficient, economic and reliable operation of electric power system. In this study, two constraint-based iterative search algorithms are proposed for optimal sizing of the wind turbine (WT), solar photovoltaic (PV) and the battery energy storage system (BESS) in the grid-connected configuration of a microgrid. The first algorithm, named as sources sizing algorithm, determines the optimal sizes of RE sources while the second algorithm, called as battery sizing algorithm, determines the optimal capacity of BESS. These algorithms are mainly based upon two key essentials, i.e. maximum reliability and minimum cost. The proposed methodology aims to avoid over- and under-sizing by searching every possible solution in the given search space. Moreover, it considers the forced outage rates of PV, WT and utilisation factor of BESS which makes it more realistic. Simulation results depict the effectiveness of the proposed approach.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.