Abstract

This paper presents a fast analysis method for power system topology observability. The method is based on the linearized power system state estimator model and uses augmented incidence matrix. In the paper, the Optimal PMU (phasor measurement units) Placement (OPP) problem is formulated as to minimize the number of PMU installation subjecting to full network observability and enough redundancy. A global optimization algorithm, Tabu search, is proposed to solve the combinatorial optimization problem and a priority list based on heuristic rule is embedded to accelerate optimization. The effectiveness and flexibility of the proposed algorithms are demonstrated by numerical results tested in IEEE 14, IEEE 57 and NE 39 bus systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.