Abstract

The Phasor Measurement Units (PMUs) will enable the state estimation of a power distribution network provided the network is observable. So far in solving the Optimal PMU Placement (OPP) problem, it was assumed that the PMUs have sufficient number of channels such that a PMU placement on any node would make all the neighboring nodes observable. This paper presents a method in which the OPP problem has been solved using PMUs with limited number of channels. The problem of combining various types of PMUs with varying costs and different channel capacity for measurement in the OPP problem has been developed and presented in this paper. Finally, the zero injection buses are included in the network when the OPP problem is solved with PMUs having limited number of channels.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.