Abstract

Issues related to the use of distributed generation for solving the problem of insufficient grid capacity in Moscow are analyzed. The problem area, where the current load of the power transmission line (TL) does not meet the requirements for the mode parameters is considered. The paper proposes an alternative way of tackling this problem by installing a low-capacity gas power plant (GPP) instead of reconstructing the power grid. Results obtained from this study can be used by electricity distribution companies as guidelines for solving the above problem.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.