Abstract
In the previous two chapters, we have discussed trajectory planning for trains in a railway network based on given train schedules. In this chapter, the train scheduling problem based on origin–destination-independent (OD-independent ) passenger demands for an urban rail transit line is considered with the aim of minimizing the total travel time of passengers and the energy consumption of trains. We propose a new iterative convex programming (ICP) approach to solve this train scheduling problem. Via a case study inspired by the Beijing Yizhuang line, the performance of the ICP approach is compared with other alternative approaches, such as nonlinear programming approaches, a mixed integer nonlinear programming (MINLP) approach, and a mixed integer linear programming (MILP) approach. The research discussed in this chapter is based on Wang et al. (Efficient real-time train scheduling for urban rail transit systems using iterative convex programming. IEEE Trans Intell Transp Syst 16:3337–3352, 2015) [1]; Wang et al. (Proceedings of the 1st IEEE international conference on intelligent rail transportation (2013 IEEE ICIRT), Beijing, China, 2013) [2]; Wang et al. (Proceedings of the 16th international IEEE conference on intelligent transportation systems (ITSC 2013), The Netherlands, The Hague,pp 1334–1339, 2013) [3].
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.