Abstract

Increase in downhole mining prompts the need to develop effective methods for maintenance of shafts. Currently, grouting behind the shaft wall is the main approach used for prevention of water seepage into the shaft. Several factors determine the grouting effect, and grouting often fails during field applications due to use of ineffective parameters. In the present study, numerical simulation was performed to evaluate slurry diffusion regularity under different grouting parameters based on the factors that affect shaft grouting. The simulation results showed that the overall diffusion radius of the slurry increased with increase in grouting time and stabilized toward the end of the simulation, under different grouting parameters. Porosity of the surrounding rock near the grouting hole gradually became denser with an increase in time, which is not conducive for diffusion of the slurry. The amount of water gushing at 146 m below the secondary shaft of Zhundong No. 2 mine decreased by 81% after optimizing the grouting parameters for application at the actual site. This decrease in amount of water had a significant anti-seepage effect, and it reduced grouting costs. The findings of the present study provide a basis for conducting subsequent shaft grouting projects.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call