Abstract

In order to study the vertical displacement distribution of foundation pit in the process of step-by-step excavation, combined with a foundation pit project, numerical simulation analysis with finite element software was carried in the research. The results show that: in the process of excavation, the maximum settlement of soil outside the pit is 41.4 mm, which is 2.95 ‰ of pit excavation depth and conforms to the recommended value in specifications. The maximum vertical displacement of soil at the bottom of foundation pit is in the center of pit. Its value is gradually increasing with the excavation, and the maximum is 60.1 mm, which is 4.32 ‰ of foundation pit depth,also,it conforms to the specifications proposed value. The proposed scheme can satisfy the vertical displacement of foundation pit excavation in the construction process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.