Abstract

The temperature field within a cup-shaped frozen soil wall in tunnel was examined using finite-element analysis. Assuming that the surrounding soil layer was an unfavorable soil layer in terms of thermal parameters, the feasibility of the use of the artificial horizontal ground freezing method in the tunnelling of Nanjing Metro Line 10 was demonstrated. Parametric studies were conducted on various factors affecting the closure time of the frozen soil wall. The closure time was found to be sensitive to the thermal conductivity, volumetric heat capacity, and original temperature of the surrounding soil and insensitive to the latent heat.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.