Abstract

Roof pre-splitting roadway is a new technology in roof induced rock burst prevention and control of incline coal seam. With the purpose of increasing rock burst prevention and control effective, FLAC3D numerical simulation software was used to analyze stress distribution characteristics and roof pre-splitting effect and the layout of the roof pre-splitting roadway parameters. The results showed that the roof pre-splitting roadway changed roof and floor stress distribution, the stress concentration degree is high in the zone of roof and floor around pre-splitting roadway and the two ribs of pre-splitting roadway, which made the roof strength weakened and easy to break, avoiding a large overhang in the process of mining and rock-burst; The roof pre-splitting roadway led to stress concentration in the range of 5 ~ 10 m, roof effective weakening range 12 m, so the distance of two roof pre-splitting roadway should be more than 20m. The research provided the reference basis for rock burst prevention by roof pre-splitting roadway in the incline coal seam group mining.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call