Abstract
The Water and Power Resources Service (formerly Bureau of Reclamation) established an Office of Dam Safety, Engineering, and Science as a result of the Teton Dam failure and technical and nontechnical reviews following the failure. The Service's Dam Safety Office performed its independent audit function through a Division of Dam Safety composed of experienced civil engineers and other personnel that concentrated their careers in geotechnical engineering, construction, hydraulics and hydrology, design, operations and maintenance, and geology. Implementation of review procedures and preparation of technical review standards are key activities accomplished in order to evaluate applicable technical activities. A Dam Safety Research Committee is prioritizing research needs among 84 proposed research projects. In 1978, Congress authorized –100,000,000 for the Service to rehabilitate existing dams.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Issues in Engineering: Journal of Professional Activities
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.