Abstract

We consider a multiperiod resource allocation problem, where a single resource is allocated over a finite planning horizon of Tperiods. Resource allocated to one period can be used to satisfy demand of that period or of future periods, but backordering of demand is not allowed. The objective is to allocate the resource as smoothly as possible throughout the planning horizon. We present two models: the first assumes that the allocation decision variables are continuous, whereas the second considers only integer allocations. Applications for such models are found, for example, in subassembly production planning for complex products in a multistage production environment. Efficient algorithms are presented to find optimal allocations for these models at an effort of O( T 2 ). Among all optimal policies for each model, these algorithms find the one that carries the least excess resources throughout the planning horizon.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.