Abstract

In competitive bidding for project contracts, contractors estimate the cost of completing a project and then determine the bid price. Accordingly, the bid price is markedly affected by the inaccuracies in the estimated cost. To establish a profit-making strategy in competitive bidding, it is crucial for contractors to estimate project costs accurately. Although allocating a large amount of resources to cost estimates allows contractors to prepare more accurate estimates, there is usually a limit to available resources in practice. To the best of our knowledge, however, none of the existing studies have addressed the resource allocation problem for estimating project costs in competitive bidding. To maximize a contractor’s expected profit, this paper develops a multi-period resource allocation method for estimating project costs in a sequential competitive bidding situation. Our resource allocation model is posed as a mixed integer linear programming problem by making piecewise linear approximations of the expected profit functions. Numerical experiments examine the characteristics of the optimal resource allocation and demonstrate the effectiveness of our resource allocation method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.