Abstract

Assembly and disassembly are important activities in the manufacturing/remanufacturing process. Although the line balancing problems of them have been extensively discussed in the existing literature, they are rarely integrated into one system. In this paper, a hybrid production line balancing problem is adopted while considering the similarity between the assembly and disassembly tasks. First, to better reflect the uncertainty existing in the actual production environment, a mathematical model of the multi-objective stochastic hybrid production line balancing problem is presented, in which task disassembly times are assumed to be random variables with known normal probability distributions. Then, a hybrid VNS-NSGA II algorithm combining variable neighbourhood search (VNS) and non-dominated sorting genetic algorithm II (NSGA II) is proposed to solve the problem. VNS is embedded into NSGA II as a local search to improve the quality of the solutions found by the NSGA II at each generation. Finally, the effectiveness of the proposed method is verified by a case study, and the superiority of hybrid production line is reflected by comparing the solutions of the independent production line with the hybrid production line. Computational comparisons demonstrate the potential benefits of the hybrid production line and the proposed method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.