Abstract

This work presents a constraint satisfaction problem (CSP) model for the planning and scheduling of disassembly and assembly tasks when repairing or substituting faulty parts. The problem involves not only the ordering of assembly and disassembly tasks, but also the selection of them from a set of alternatives. The goal of the plan is the minimization of the total repairing time, and the model considers, apart from the durations and resources used for the assembly and disassembly tasks, the necessary delays due to the change of configuration in the machines, and to the transportation of intermediate subassemblies between different machines. The problem considers that sub-assemblies that do not contain the faulty part are nor further disassembled, but allows non-reversible and parallel repair plans. The set of all feasible repair plans are represented by an extended And/Or graph. This extended representation embodies all of the constraints of the problem, such as temporal and resource constraints and those related to the selection of tasks for obtaining a correct plan.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.