Abstract

The optimisation problems related to the assignment of tasks to workstations in assembly and disassembly lines have been largely discussed in the literature. They are known, respectively, as Assembly Line Balancing and Disassembly Line Balancing Problems. In this study, both types of task performed on the identical product are integrated in a common hybrid production system. Therefore, the logistic process is simplified and disassembly tasks can supply easier the assembly tasks with the required components. The considered production system has the layout of two parallel lines with common workstations. The product flow is conventional in the assembly line and reverse in the disassembly line. The paper provides a new mathematical model for designing such a hybrid system and an approximate approach based on ant colony optimisation for solving large-scale instances. The solution method is tested in a case study. The obtained results are compared with the solution provided by the design of two independent lines. The analysis of the results highlights the potential benefits of the hybrid production system.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.