Abstract

Scheduling of single machine in manufacturing systems is especially complex when the order arrivals are dynamic. The complexity of the problem increases by considering the sequence-dependent setup times and machine maintenance in dynamic manufacturing environment. Computational experiments in literature showed that even solving the static single machine scheduling problem without considering regular maintenance activities is NP-hard. Multi-agent systems, a branch of artificial intelligence provide a new alternative way for solving dynamic and complex problems. In this paper a collaborative multi-agent based optimization method is proposed for single machine scheduling problem with sequence-dependent setup times and maintenance constraints. The problem is solved under the condition of both regular and irregular maintenance activities. The solutions of multi-agent based approach are compared with some static single machine scheduling problem sets which are available in the literature. The method is also tested under real-time manufacturing environment where computational time plays a critical role during decision making process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.