Abstract

A fundamental scheduling problem is to determine a production start (ready) time based on customer-specified due dates. Typically, the objective is to delay the ready time in an attempt to minimize work-in-process inventory and maximize production system utilization. In many practical situations, highly variable service times complicate this problem. In such a case, the ready time implies a level of on-time completion confidence for each job. As the ready time increases, the on-time confidence decreases. This paper investigates the ready time/job confidence level tradeoff. A multi-objective model balances the ready time and confidence level maximization goals. The model involves combinatorial and numerical optimization and has an exceptionally complex state space. In view of these complexities, we investigate a pairwise interchange heuristic and a genetic algorithm search solution. Experimental results support solution through a process involving both the heuristic and the genetic algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.