Abstract

This research aims at minimizing the makespan of a set of identical batch processing machines arranged in parallel. Each job is defined by its processing time, ready time, and size. Each machine can process several jobs simultaneously as long as the machine capacity is not exceeded. The batch processing and ready times depend upon the batch composition. The batch processing time is equal to the longest processing job in the batch, and the batch ready time is equal to the largest ready time among those jobs in the batch. The problem under study is NP-hard. Consequently, a constructive heuristic is proposed and its performance with respect to solution quality and computational cost is compared against other solution approaches found in the literature. The computational experiments on a set of randomly generated instances show that the performance of the proposed heuristic is competitive with respect to solution quality and requires little computational cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call