Abstract
In this paper, we consider a scheduling problem for a single batch processing machine in semiconductor wafer fabrication facilities (wafer fabs). A batch is a group of jobs that are processed at the same time on a single machine. The jobs belong to incompatible families. Only jobs of the same family can be batched together. Each job has a weight, a due date, and a ready time. The performance measure of interest is the total weighted tardiness (TWT). The ready times are calculated based on information related to upstream machines that is stored in a Manufacturing Execution System (MES). Therefore, they can be uncertain. We propose a genetic algorithm (GA)-based approach. Sampling is used to take into account the uncertainty of the ready times. Results of computational experiments are reported that demonstrate that this approach performs well with respect to computing time and solution quality.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.