Abstract
Production scheduling problems have historically emphasized cycle time without involving the environmental factors. In the study, a low-carbon scheduling problem in a flexible job shop is considered to minimize the energy consumption, which mainly consists of two parts: the useful part and the wasted part. First, a mathematical model is built based on the features of the workshop. Second, a modified migrating bird's optimization (MMBO) is developed to obtain the optimal solution. In the MMBO, a population initialization scheme is designed to enhance the solution quality and convergence speed. Five types of neighborhood structures are introduced to create neighborhood solutions. Furthermore, a local search method and a reset mechanism are developed to improve the computational results. Finally, experimental results validate that the MMBO is effective and feasible.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have