Abstract

The basic purpose of railway traffic control devices is to ensure a high level of safety of moving trains on the railway network. The railway traffic control devices often work in difficult environmental conditions and are exposed to external interference. These circumstances require continuous analysis of the state of the railway traffic control system. With time, the system's technical condition deteriorates. When its technical condition is not satisfactory it is necessary to operate it and renew its state of use. The rational implementation of exploitation tasks of the railway traffic control system allows the introduction of mathematical modeling methods into exploitation tests. Using the mathematical model of the exploitation process of the railway traffic control system, it is possible to forecast e.g. reliability indicators of its individual objects. Knowledge of exploitation parameters should be used in making decisions in the process of managing the exploitation of the railway traffic control devices.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.