Abstract
An approach is proposed to optimize the operation of energy production systems over middle term planning periods. Randomness of primary load is explicitly considered. A precise model is used to represent the hydraulic system (with individualized reservoir in cascade, water transportation delays, nonlinear generation, ...) as well as the non-hydraulic system (thermal generations, interchanges, load shedding, ...). Difficulties resulting from the large scale are overcome by decomposition techniques.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.