Abstract
Production planning is a tactical scheme in the supply chain management of product that aims to provide optimal solutions based on the inventory stock of the company in terms of fulfilling the production demand. The variable of demand, supply, and production amount is used in this research as an input to determine the production by the implementation of Fuzzy-Mamdani Logic (FML). This research aims to obtain the optimal production and supply planning for several periods, which later comparing the total cost through the Fuzzy-Mamdani Logic implementation with the method used by the company. The objects for this research are the 7’ and 10’ big-corrugation types of zinc sheets manufactured by PT Y, which is the highest demand product of the company. The result shows that the implementation of FML outlined as an appropriate solution for the decision making to determine the production amount. The amount production itself for the 7’ and 10’ big-corrugation type of zinc sheets during June 2017 - May 2018 were 663,700 and 640,400 quantities for each model, while production in June 2017 was only 18,100 and 32,800 quantities.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have