Abstract
A procedure for the single machine-scheduling problem of minimizing the maximum lateness for jobs with sequence independent set-ups is presented. The procedure provides optimal/near-optimal solutions over a wide range of problems. It performs well compared with other heuristics, and it is effective in finding solutions for large problems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.