Abstract

A procedure for the single machine-scheduling problem of minimizing the maximum lateness for jobs with sequence independent set-ups is presented. The procedure provides optimal/near-optimal solutions over a wide range of problems. It performs well compared with other heuristics, and it is effective in finding solutions for large problems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.