Abstract

This paper considers single machine scheduling problems with group technology (GT) and deteriorating jobs. A sequence independent setup is required to process a job from a different group and jobs in each group are processed together. We consider the case of jobs whose processing times are a decreasing function of their starting time. The objectives of scheduling problems are to minimize the makespan and the total completion time, respectively. We also provide polynomial time algorithms to solve these problems.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call