Abstract

We consider single machine scheduling problems in the context of adversarial bilevel optimization where two agents, the leader and the follower, take decisions on the same jobset and the leader acts first with the aim of inducing the worst possible solution for the follower. Thus, the follower schedules the jobs in order to optimize a given criterion. The considered criteria are the total completion time, the total weighted completion time, the maximum lateness and the number of tardy jobs. We focus on adversarial bilevel scheduling with job selection and data modification. In the case with job selection, the leader selects a fixed cardinality subset of the jobs that the follower schedules next. In the case with data modification, the leader can modify some of the data (processing times, due dates, weights), given a limited budget Q. Thus, the follower schedules the set of jobs with modified data. For all the considered criteria either we provide polynomial-time algorithms or show that they can be solved in the worst-case in pseudo-polynomial time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.