Abstract

In article the problem of distribution of technology dependent works on contractors is considered during creation of the innovation production due to capital investments in means of mechanization and automation of construction production that allows to construct such schedule by means of which time of accomplishment of the corresponding amount of works is minimized by the set great number of contractors and the optimum sequence of their accomplishment is defined. At the same time job sharing on contractors with use of methods of research of stream — Dijkstra’s algorithms is considered optimum. The relevance of creation of this model is defined by need of rational use of human resources. It is possible to carry possibility of process description of construction to advantages of model at the same time of several objects the innovation means of production with increase in parameters of organizational and technology reliability.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call