Abstract
A superconducting magnet assembly has been built for an ECR (Electron Cyclotron Resonance) ion source at the 88-inch cyclotron at LBL. Three 34-cm ID solenoids provide axial plasma confinement and a sextupole assembly in the solenoid bore provides radial stability. Two large solenoids are spaced 50 cm. Apart with a smaller opposing solenoid between. The sextupole assembly is 92 cm long with winding inner diameter of 20 cm. And outer diameter of 27.2 cm. The design goal is to achieve a field on axis of 4 T and 3 T at the mirrors with 0.4 T between and a sextupole field of 2.0 T at 15-cm diameter in the confinement volume. Each solenoid uses rectangular conductor wish copper/SC ratio of 4; the three coils are wet-wound on a one-piece aluminum bobbin with aluminum banding for radial support. The sextupole uses rectangular conductor with copper/SC ratio of 3. Each of the 6 coils is wet-wound with filled epoxy on a metal pole; the ends of the pole are aluminum and the central 34-cm is iron to augment the sextupole field. The six coils are assembled on a 20-cm-OD stainless steel tube with a 1.4-cm thick 30.0-cm OD aluminum tube over the assembly for structural support. Thin metal bladders are expanded azimuthally between each coil and axially at tire ends to pre-load the assembly. The sextupole assembly fits inside the solenoid bobbin, which provides support for the magnetic forces. The magnet exceeds design requirements with minimum training.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have