Abstract

This paper focuses on the feasability of operating a Light Rail Transit (LRT) priority system within the environment of an existing Urban Traffic Signal Control System (UTC) in Dublin. The city uses the Australian UTC-System SCATS (Sydney Co-ordinated Adaptive Traffic System). So far no LRT is running in Dublin yet, but the objective of the study was to establish the degree of LRT priority to be achieved within the existing SCATS UTC. The study was carried out using the microscopic traffic simulation model VISSIM. The simulations clearly show that LRT priority is possible within SCATS on a tactical (local) level at each controller.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.