Abstract
The multi-mode resource-constrained project scheduling problem with minimum and maximum time lags MRCPSP/max is a very general project scheduling problem with multiple execution modes per activity, renewable and non-renewable resources and minimum and maximum time lags between activities. In this paper, we describe SA-EVA, an algorithm for the problem. SA-EVA first searches for the best mode for each activity, without considering renewable resources. In this phase a simulated annealing is applied. Once a mode vector has been chosen, the problem reduces to the RCPSP/max, which SA-EVA solves with EVA, an algorithm designed in Ballestín et al. [2009. An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time-lags. Journal of Scheduling, 14 (4), online]. Computational results show that SA-EVA outperforms the state-of-the-art algorithms in medium and large instances.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.