Abstract

The multi-mode resource-constrained project scheduling problem with minimum and maximum time lags is considered in the paper. An activity is performed in a mode, which determines the demand of renewable and nonrenewable resources required for its processing and minimum and maximum time lags between adjacent activities. The goal is to find a mode assignment to the activities and their start times such that all constraints are satisfied and the project duration is minimized. Because the problem is NP-hard a population-learning algorithm (PLA2) is proposed to tackle the problem. PLA2 is a population-based approach which takes advantage of the features common to the social education system rather than to the evolutionary processes. The proposed approach perfectly suits for multi-agent systems because it is based on the idea of constructing a hybrid algorithm integrating different optimization techniques complementing each other and producing a synergetic effect. Results of the experiment were compared to the results published in Project Scheduling Problem Library.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call